System Annual Report

Print Email
Last Updated on Tuesday, 10 September 2013 15:53

(Future site of Annual Maintenance & Performance Certification Report Form)

 

The Eastern WA Phase II Municipal Stormwater Permit requires the City to ensure that private stormwater systems (i.e. detention ponds, catch basins, bioswales, etc.) are being adequately maintained and that the facilities are operating as designed to protect water quality. In lieu of requiring that continual access be granted to perform these checks, the City may opt to require annual certification by a qualified third party. If the City decides to go this route, the annual report form will be available on this site.

 

This requirement will take effect no later than February 16, 2010.